/
Rescue operations continued in Nepal’s Gorkha district after an Oct 11 flash flood on the Budhi Gandaki River. More than 80 people were rescued, but five remain missing as homes, bridges and hydropower sites suffered heavy damage.

Nepalese rescue teams continued operations on Monday after a flash flood tore through the Budhi Gandaki River valley in Gorkha district, sweeping away homes and bridges and leaving five people missing.
Authorities said more than 80 people were pulled to safety on October 11, including nine foreign nationals, as helicopters and ground teams evacuated residents from cut-off settlements in the Manaslu region. No deaths have been officially confirmed so far.
The flood hit early on October 11, sending a sudden wall of muddy water, boulders and debris downriver. Investigators have pointed to a landslide-related blockage that temporarily dammed a stream near the upper valley, forming a short-lived lake that later burst and unleashed the surge downstream.
The National Disaster Risk Reduction and Management Authority (NDRRMA) said 82 people were rescued in Gorkha district by four helicopters. Those evacuated included nine foreign nationals who were in the trekking area when trails and bridges were damaged.
Five people, including two women, remained unaccounted for as of Monday, with teams searching along the river corridor and checking isolated hamlets where access has been cut by broken crossings and damaged tracks.
Separate reports have also spoken of larger missing figures in the early hours after the flood, as well as tourists stranded in the Manaslu trekking region. Officials have been verifying names and locations as communications have been disrupted.
The Nepal Army was among the first responders. In the initial response, it rescued 49 people as the floodwaters receded enough for evacuations to start, and it has continued to assist with searches and movement of supplies.
NDRRMA issued urgent alerts and evacuation instructions for downstream communities, warning residents along the Budhi Gandaki corridor toward Jagat and Arughat to move away from the riverbanks as the risk of further surges remained.
Damage assessments on Monday painted a picture of a valley battered in minutes. NDRRMA said 45 houses were completely damaged and 27 houses were partially damaged. It also reported damage to 34 cow sheds and said three vehicles were swept away.
Bridges took some of the hardest blows. The authority said two suspension bridges and two motorable bridges were damaged. Other reports have put the number of bridges swept away or damaged higher, reflecting the difficulty of surveying a remote gorge where crossings are scattered and some sites remain inaccessible.
Hydropower infrastructure was also affected. NDRRMA said three hydropower projects were damaged. Separate reports said the under-construction 341 MW Budhi Gandaki hydropower project suffered heavy losses, including damage to a construction camp and equipment near Salleri.
The flood also disrupted local power and communications, complicating the effort to account for residents and reach communities that rely on a small number of footbridges and narrow roads carved into steep slopes.
Officials and investigators have been focusing on a familiar Himalayan hazard: rivers suddenly swollen not just by rain, but by the failure of temporary dams formed by landslides and debris.
In this case, investigators indicated a dry landslide or debris block near Chumchet and Lokpa may have created a barrier lake that later breached. Other accounts described a landslide above Siuribas blocking the Chumke Khola stream, or a temporary blockage near Chekampar that gave way. The precise trigger is still being examined, but the mechanism is consistent with past disasters in Nepal’s mountain valleys.
The latest flood comes as Nepal continues to recover from earlier, catastrophic flooding along the Nepal–China border in late August. That disaster involved the Bhotekoshi and Trishuli river systems and caused extensive infrastructure damage alongside a very high death toll, stretching national response capacity and leaving long-term reconstruction needs.
In the Budhi Gandaki valley, the immediate priorities are locating those still missing, restoring crossings and basic services, and re-establishing safe access for residents and trekkers. With bridges down and trails damaged, helicopters have been essential, but authorities have warned that weather and terrain can quickly limit flying.
For communities along the river, the danger is not over when the water drops. Fresh landslides can re-block channels, and unstable slopes can fail again, sending new pulses of debris downstream. That is why evacuation alerts have focused on keeping people away from riverbanks and damaged crossings while assessments continue.
Rescue and repair teams are expected to keep working through the week as engineers inspect bridges and hydropower sites, and as officials update missing-person counts once communications and access improve.
What did you think?
French authorities confirmed on 22 October the first known human infection with Shamonda virus, a midge-borne virus of cattle. The patient, who was severely immunocompromised, died in Lyon in early October. Officials say no risk to the general public has been identified.
Amita Sahani4 min
Ultra Gas said it will add 15 LNG retail stations by the end of the current financial year, taking its network to 25 by March. The firm plans ₹900 crore investment for 100-plus outlets by FY29, pitching 25%-30% fuel savings for trucking.
Reyaansh Agarawal4 min
The Uttar Pradesh Subordinate Services Selection Commission starts the three-day Preliminary Eligibility Test today. About 35.42 lakh candidates will sit it in 60 districts on 25 October, 30 October and 1 November, in two shifts a day.
Amita Sahani4 min
A blast at an under-construction building in Bengaluru's Pulakeshinagar on 20 October injured two workers. Police are examining a parcel account and a battery theory, and the NIA has asked for the investigation reports. The cause is not yet confirmed.
Reyaansh Agarawal4 min
The Patna bench of the Central Administrative Tribunal has declined to quash disciplinary proceedings against Bihar IPS officer Aditya Kumar, who is accused of a conspiracy to impersonate a former Patna High Court Chief Justice. It asked the State to finish the inquiry preferably within six months.
Prateek Rawat4 min
Chief Minister Sukhvinder Singh Sukhu says postgraduate medical seats in Himachal Pradesh's six government medical colleges have risen from 277 to 597, an increase of 320. IGMC Shimla now has 230 seats, and the state aims for 80 to 85 per cent doctor availability next year.
Subhash Gupta4 min
SSC has released the SSC JE Tier 1 exam city intimation slip for 2026, issued on 23 October. Paper 1 is scheduled from 2 to 6 November, while admit cards are expected 2–3 days before each exam date.
Reyaansh Agarawal3 min
The CBI arrested an Enforcement Directorate officer and a head constable on deputation from the CRPF on Friday for allegedly taking Rs 5 lakh from the father of a complainant who had been summoned in an ED case. The trap ran in Delhi and Lucknow.
Subhash Gupta3 min
Power employees ended their two-day strike on Friday after a three-hour meeting in Panchkula. The state used Section 108 of the Electricity Act to tell the regulator not to create or operationalise any parallel distribution licence, and Chief Minister Saini promised no privatisation.
Reyaansh Agarawal4 min
A low-pressure area that formed over the Bay of Bengal on Friday is expected to become a depression on Saturday, a deep depression on Sunday and a cyclonic storm on Monday morning, says the IMD. It may reach the north Andhra and south Odisha coast early on 28 October, with extremely heavy rain.
Amita Sahani4 min
Owners of the vehicles hired by Aavin to deliver milk in Chennai ended a strike that began without notice on 16 October. Aavin says supply to its parlours and outlets was not affected, but retailers say sweets and savouries ran short before Ayudha Puja and want the government to look into it.
Prateek Rawat3 min
India's second Vande Bharat sleeper is due to be flagged off between Bengaluru and Mumbai on 1 November, cutting the journey to about 16 hours. It has 16 coaches and 823 berths in three AC classes. Timings are proposed and fares are not yet official.
Amita Sahani3 min