/
Rescue operations continued in Nepal’s Gorkha district after an Oct 11 flash flood on the Budhi Gandaki River. More than 80 people were rescued, but five remain missing as homes, bridges and hydropower sites suffered heavy damage.

Nepalese rescue teams continued operations on Monday after a flash flood tore through the Budhi Gandaki River valley in Gorkha district, sweeping away homes and bridges and leaving five people missing.
Authorities said more than 80 people were pulled to safety on October 11, including nine foreign nationals, as helicopters and ground teams evacuated residents from cut-off settlements in the Manaslu region. No deaths have been officially confirmed so far.
The flood hit early on October 11, sending a sudden wall of muddy water, boulders and debris downriver. Investigators have pointed to a landslide-related blockage that temporarily dammed a stream near the upper valley, forming a short-lived lake that later burst and unleashed the surge downstream.
The National Disaster Risk Reduction and Management Authority (NDRRMA) said 82 people were rescued in Gorkha district by four helicopters. Those evacuated included nine foreign nationals who were in the trekking area when trails and bridges were damaged.
Five people, including two women, remained unaccounted for as of Monday, with teams searching along the river corridor and checking isolated hamlets where access has been cut by broken crossings and damaged tracks.
Separate reports have also spoken of larger missing figures in the early hours after the flood, as well as tourists stranded in the Manaslu trekking region. Officials have been verifying names and locations as communications have been disrupted.
The Nepal Army was among the first responders. In the initial response, it rescued 49 people as the floodwaters receded enough for evacuations to start, and it has continued to assist with searches and movement of supplies.
NDRRMA issued urgent alerts and evacuation instructions for downstream communities, warning residents along the Budhi Gandaki corridor toward Jagat and Arughat to move away from the riverbanks as the risk of further surges remained.
Damage assessments on Monday painted a picture of a valley battered in minutes. NDRRMA said 45 houses were completely damaged and 27 houses were partially damaged. It also reported damage to 34 cow sheds and said three vehicles were swept away.
Bridges took some of the hardest blows. The authority said two suspension bridges and two motorable bridges were damaged. Other reports have put the number of bridges swept away or damaged higher, reflecting the difficulty of surveying a remote gorge where crossings are scattered and some sites remain inaccessible.
Hydropower infrastructure was also affected. NDRRMA said three hydropower projects were damaged. Separate reports said the under-construction 341 MW Budhi Gandaki hydropower project suffered heavy losses, including damage to a construction camp and equipment near Salleri.
The flood also disrupted local power and communications, complicating the effort to account for residents and reach communities that rely on a small number of footbridges and narrow roads carved into steep slopes.
Officials and investigators have been focusing on a familiar Himalayan hazard: rivers suddenly swollen not just by rain, but by the failure of temporary dams formed by landslides and debris.
In this case, investigators indicated a dry landslide or debris block near Chumchet and Lokpa may have created a barrier lake that later breached. Other accounts described a landslide above Siuribas blocking the Chumke Khola stream, or a temporary blockage near Chekampar that gave way. The precise trigger is still being examined, but the mechanism is consistent with past disasters in Nepal’s mountain valleys.
The latest flood comes as Nepal continues to recover from earlier, catastrophic flooding along the Nepal–China border in late August. That disaster involved the Bhotekoshi and Trishuli river systems and caused extensive infrastructure damage alongside a very high death toll, stretching national response capacity and leaving long-term reconstruction needs.
In the Budhi Gandaki valley, the immediate priorities are locating those still missing, restoring crossings and basic services, and re-establishing safe access for residents and trekkers. With bridges down and trails damaged, helicopters have been essential, but authorities have warned that weather and terrain can quickly limit flying.
For communities along the river, the danger is not over when the water drops. Fresh landslides can re-block channels, and unstable slopes can fail again, sending new pulses of debris downstream. That is why evacuation alerts have focused on keeping people away from riverbanks and damaged crossings while assessments continue.
Rescue and repair teams are expected to keep working through the week as engineers inspect bridges and hydropower sites, and as officials update missing-person counts once communications and access improve.
What did you think?
Searches for the next Rs 2,000 payment are among India's top trends, but no release date has been announced. The 20 October date in viral posts is a guess and the Rs 4,000 claim is fake. Here is what is confirmed, who is eligible, why payments stall and how to check.
Reyaansh Agarawal4 min
You're all caught up.
IMD expects a low-pressure area over the Bay of Bengal this week, with heavy to very heavy rain in Tamil Nadu, Kerala and coastal Andhra Pradesh. It may become a depression by 27 October and, possibly, a cyclonic storm near the Andhra-Odisha coast by month end.
Prateek Rawat3 min
A pre-dawn fire ripped through Baghajatin Market in south Kolkata on Tuesday, gutting several shops. Fifteen fire tenders were deployed and the blaze was brought under control after about three hours. No deaths or injuries were reported; a short circuit is suspected.
Reyaansh Agarawal3 min
India Post has approved a 60-day Productivity-Linked Bonus for eligible employees for 2025-26, with payouts expected before Diwali. The maximum payment for full-year eligible staff is around ₹14,000 under the calculation ceiling.
Reyaansh Agarawal3 min
Seven people were remanded to 10-day police custody after the Chorbagan Durga Puja stampede in north Kolkata that killed 19 and injured 25. The state ordered safety checks at major pandals, announced ₹25 lakh compensation for families, and police issued helplines.
Prateek Rawat4 min
CWC opened online applications on Oct 17, 2026 for 327 Assistant Manager and Junior Executive posts. The window closes Nov 15, with roles across General, Technical, Finance and engineering streams.
Reyaansh Agarawal2 min
Domestic LPG prices remained unchanged on 15 October, with a 14.2 kg cylinder at ₹942 in Delhi and ₹941.50 in Mumbai. Commercial LPG stayed at October’s higher baseline, with a 19 kg cylinder at ₹2,810 in Delhi and ₹2,764.50 in Mumbai.
Reyaansh Agarawal3 min
Weather shifted sharply on Thursday, Oct. 15, with storms and flood concerns in Oklahoma, rain turning to freeze risk in Colorado, and a cool-down then brief warm-up near New York City. Washington, D.C., also cooled as a cold front ended near-90°F warmth from Wednesday.
Reyaansh Agarawal6 min
UP’s Dashmottar scholarship window for 2026–27 is nearing key deadlines. Renewals must apply online by Oct 15, while fresh applicants have time until Oct 31. Aadhaar-linked verification, DigiLocker and institute submission remain mandatory steps.
Reyaansh Agarawal2 min
Heavy rain and thunderstorms hit Delhi-NCR on Oct 12, prompting an IMD red alert and reports of waterlogging and fallen trees. Temperatures dipped sharply, but forecasts suggest rain will ease and the week will turn partly cloudy and warmer.
Prateek Rawat3 min
Karnataka Post continued counter sales of its Philately Passport on Oct 11 after long queues on the opening day. The ₹600 booklet is being sold in limited numbers at Bengaluru, Mysuru, Mangaluru and Belagavi, letting buyers collect PPC cancellations at designated post offices.
Reyaansh Agarawal3 min